Question 1

After the Avaya Aura® Media Server High Availability (HA) pair is formed, several Element Manager pages display new features that reflect the new paired High Availability state/status. 
In the primary AAMS Element Manager navigation pane, which three features do you need to status? (Choose three.)


  1. Ensure one Element Role is listed for both the Primary and Backup server.
  2. Ensure one Element Role is listed for both the Active and Standby server.
  3. Ensure only two nodes are listed.
  4. Ensure no alarms are listed in the Alarm Description column.
Correct answer: ABC
Explanation:
Reference: https://downloads.avaya.com/css/P8/documents/100172577 (410)
Reference: https://downloads.avaya.com/css/P8/documents/100172577 (410)



Question 2

On which servers is the Enable Switchover function available when configuring Avaya Aura® Contact Center (AACC) High Availability (HA)?


  1. Primary Server
  2. Primary and Backup Servers
  3. Active and Standby Servers
  4. Active Server
Correct answer: D
Explanation:
Reference: https://downloads.avaya.com/css/P8/documents/100172577 (592)
Reference: https://downloads.avaya.com/css/P8/documents/100172577 (592)



Question 3

In a Mission Critical AACC High Availability (HA) campus solution, there are two types of switchovers, managed and unmanaged. A managed switchover is one initiated by the administrator or caused by a failure of a monitored Contact Center Manager Server (CCMS) or Communication Control Toolkit (CCT) component. An unmanaged switchover results from a hardware, network, database or power failure. 
Which three conditions must be satisfied before a switch over can occur? (Choose three.)


  1. The active server database and standby server database are synchronized, and the standby server database is shadowing the active server database.
  2. On the active server, all critical CCMS and CCT services are monitored and running.
  3. The active and standby servers are in a running state.
  4. The active and standby servers have switchover enabled.
Correct answer: BCD