Download BCS.ISEB-SWTINT1.PracticeTest.2018-02-15.19q.vcex

Download Exam

File Info

Exam ISEB Intermediate Certificate in Software Testing (BH0-007)
Number ISEB-SWTINT1
File Name BCS.ISEB-SWTINT1.PracticeTest.2018-02-15.19q.vcex
Size 259 KB
Posted Feb 15, 2018
Download BCS.ISEB-SWTINT1.PracticeTest.2018-02-15.19q.vcex

How to open VCEX & EXAM Files?

Files with VCEX & EXAM extensions can be opened by ProfExam Simulator.

Purchase

Coupon: MASTEREXAM
With discount: 20%






Demo Questions

Question 1

Exhibit:
 
Which of the items displayed in the exhibit are characteristic of regression testing.


  1. ii, iv.
  2. ii, iii.
  3. i, iii, iv.
  4. iii.
Correct answer: B



Question 2

Exhibit: 
 
Which of the benefits displayed in the exhibit are MOST likely to be achieved by using test tools?


  1. ii and iv
  2. ii and iii
  3. i and iv
  4. i and iii
Correct answer: C



Question 3

Which of the following is a MAJOR task of test planning?


  1. Scheduling test analysis and design tasks.
  2. Initiating corrective actions.
  3. Monitoring progress and test coverage.
  4. Measuring and analyzing results.
Correct answer: A



Question 4

Which of the types of defects that are displayed in the exhibit use case testing MOST LIKELY to uncover? 
i. Defects in the process flow during real-world use of the system. 
ii. Defects in the interface parameters in integration testing. 
iii. Integration defects caused by the interaction and interference of different components. 
iv. Defects in the system as it transitions between one state and another.


  1. ii, iii.
  2. i, iii.
  3. iii, iv.
  4. i, ii
Correct answer: B



Question 5

When should configuration management procedures be implemented?


  1. During test planning.
  2. During test analysis.
  3. During test execution.
  4. When evaluating exit criteria
Correct answer: A



Question 6

Who would USUALLY perform debugging activities?


  1. Developers.
  2. Analysts.
  3. Testers.
  4. Incident Managers.
Correct answer: A



Question 7

Which of the following BEST describes the difference between an inspection and a walkthrough?


  1. Both inspections and walkthroughs are led by the author.
  2. An inspection is led by a moderator and a walkthrough is led by the author.
  3. Both inspections and walkthroughs are led by a trained moderator.
  4. A walkthrough is led by the author. The author is not present during inspections.
Correct answer: B



Question 8

Which of the following is a purpose of the review planning phase?


  1. Log defects.
  2. Explain the documents to the participants.
  3. Gather metrics.
  4. Allocate the individual roles.
Correct answer: D



Question 9

Which of the following is TRUE?


  1. Confirmation testing is testing fixes to a set of defects and Regression testing is testing to establish whether any defects have been introduced as a result of changes.
  2. Confirmation testing is testing to establish whether any defects have been introduced as a result of changes and Regression testing is testing fixes to a set of defects.
  3. Confirmation testing and Regression testing are both testing to establish whether any defects have been introduced as a result of changes.
  4. Confirmation testing and Regression testing are both testing fixes to a set of defects.
Correct answer: A



Question 10

Exhibit:
 
Which of the combinations displayed in the exhibit correctly describes a valid approach to component testing:


  1. i and ii.
  2. i, ii and iii
  3. iii.
  4. ii and iv
Correct answer: B









CONNECT US

Facebook

Twitter

PROFEXAM WITH A 20% DISCOUNT

You can buy ProfExam with a 20% discount!



HOW TO OPEN VCEX FILES

Use ProfExam Simulator to open VCEX files