Question 1

Examine the following process flow:
  
The Orders Collection contains the following data:
  
The Saved Quantity Data Item is configured as a number with the initial value 0. 
The Loop Orders stage is configured to loop through the Orders collection. 
The Get Quantity stage is configured as follows:
  
What will the data item Saved Quantity contain after the execution of the page?


  1. 4
  2. 5
  3. 10
  4. 19
Correct answer: D



Question 2

Examine the following process flow:
  
The Loop Orders loop is configured to loop through the Orders collection. 
How many times will the ‘Process Order’ page be executed?


  1. 1
  2. 15
  3. The loop will be infinite
  4. It’s impossible to tell. There is no loop counter.
Correct answer: B



Question 3

Study the following page in a process:
  
Calculation stages will write A, B or C to the Output value data item. 
What will be the outcome after the page has run?


  1. Data Item Output Value contains “A”
  2. Data Item Output Value contains “B”
  3. Data Item Output Value contains “C”
  4. An Internal Exception will be thrown
Correct answer: A



Question 4

Study the following process flow:
  
This is the Main Page of a simple process which calls the Page Calculation before completing. 
The data items are configured as follows:
  • X is a Number data item with an initial value of 20 
  • Y is a Number data item with an initial value of 5 
  • Result is a Number data item with no initial value 
The Calculation Page stage is configured as follows:
  
The Calculation Page is as follows:
  
The Data Items are configured as follow:
  • X is a Number data item with an initial value of 10 
  • Y is a Number data item with an initial value of 5 
  • Result is a Number data item with no initial value 
The Start Stage is configured pass through the X and Y values an input parameters 
The divide calculation stage expression is [X] / [Y] 
The end stage is configured to pass back the results value as an output parameter. 
What will be contained in the Result Data Item on the Main Page following the execution of the Process?


  1. 0
  2. No Value
  3. 2
  4. 4
Correct answer: D



Question 5

Study the following configuration:
  
  
Which of the following statements is correct?


  1. When the configuration is run in Control Room, it will become stuck in an infinite loop
  2. When the configuration is run in Control Room, it will become stuck in an infinite loop until the ‘Switch’ Environment Variable is changed to True in System Manager
  3. When the configuration is run in Control Room, it will become stuck in an infinite loop until the ‘Switch’ Environment Variable is changed to True in the Control Room
  4. When the configuration is run in Control Room, it will fail with an internal error on the first execution of the ‘Switch?’ stage with the error: Decision did not result in a yes/no answer
Correct answer: B



Question 6

You identify an element in Application Modeller but when you highlight or use that element Blue Prism gives you an error message saying that duplicate elements were found. 
Which of the following statements is true?


  1. It is common for duplicate elements to be found based upon the attributes that are ticked by default using the Blue Prism product. Time needs to be spent experimenting with the attribute ticks until a unique, reliable, and consistent selection of attributes is found.
  2. It will not be possible to interface with the element in a unique way. You will need to use Surface Automation techniques for this element.
  3. A code stage interface will need to be created and used for this application, this will give you more flexibility to interact with the application elements.
  4. You will need to make the attributes you have selected dynamic. This will allow your flow to loop around, incrementing the attribute value until the correct element is found and used.
Correct answer: D



Question 7

Which of the following statements about Business Objects is true?


  1. It is Blue Prism best practice to include business rules within Business Objects
  2. A Business Object is configured in the Studio area of Blue Prism
  3. A Business Object can be exposed to Control Room
  4. Logging of individual stages is not configurable in Business Objects
Correct answer: B



Question 8

You identify an element in Application Modeller and it highlights uniquely and can be used in your object flow diagram. The next day you find that Blue Prism cannot identify the same element any longer, your object flow is giving you ‘Element not found’ exceptions. 
Which of the following statements is true?


  1. This must be an environment issue. The Blue Prism environment must be consistent and persistent, and an element that worked one day and does not work the next day suggests the environment is changeable. The IT team supporting the environment needs to be contacted to fix the problem.
  2. The Blue Prism product support team should be contacted to report the issue. This signifies an inconsistency in how the Blue Prism product is working which needs to be fixed.
  3. This suggests that Best Practice exception handling has not been implemented in the object. A retry loop around the object stages that are using the element will probably fix the problem.
  4. It is common for consistency issues to be found during configuration/development testing. The most likely cause is that an attribute has been selected for the element that is changeable, such as a window title with a date, or a URL. The developer needs to ensure that any changeable attributes are unticked.
Correct answer: D



Question 9

When automating a Windows application what type of stage is configured to perform a Global Send Key Events?


  1. Notes Stage
  2. Read Stage
  3. Write Stage
  4. Navigate Stage
Correct answer: C
Explanation:
Reference: https://www.rpaforum.net/threads/global-send-keys-and-send-key-events.1587/
Reference: https://www.rpaforum.net/threads/global-send-keys-and-send-key-events.1587/



Question 10

When entering an option within the Training Order system the relevant option number is entered into the Option number field as below. The Option number input field has been spied in Blue Prism:
  
The following attribute set has been returned by Application Modeller:
  
Which Attribute can be un-ticked to ensure consistent visibility of the element to Blue Prism?


  1. Window Text
  2. Visible
  3. Screen Visible
  4. Class Name
Correct answer: A