Question 2
Scenario: A Citrix Architect and a team of Workspacelab members met to discuss a NetScaler design project. They captured the following requirements from this design discussion:
A pair of NetScaler MPX appliances will be deployed in the DMZ network.
High Availability will be accessible in the NetScaler MPX in the DMZ Network.
Load balancing should be performed for the internal network services like Microsoft Exchange Client Access Services and Microsoft App-V.
The load balancing should be performed for StoreFront.
The NetScaler Gateway virtual server will be utilizing the StoreFront load-balancing virtual server.
The NetScaler Gateway virtual server and StoreFront.
The NetScaler Gateway virtual service and StoreFront and load-balancing services are publicly accessible.
The traffic for internal and external services must be isolated.
Click the Exhibit button to review the logical network diagram.
Which two design decisions are incorrect based on these requirements? (Choose two.)
LB StoreFront bound to traffic Domain 0
NetScaler Gateway VIP bound to Traffic Domain 1
LB APP-V bound to Traffic Domain 1
SNIP 192.168.20.2 bound to Traffic Domain 1
Correct answer: AB