Download Huawei.H35-481.VCEplus.2023-03-20.60q.tqb

Download Exam

File Info

Exam HCIP-5G-RAN V1.0
Number H35-481
File Name Huawei.H35-481.VCEplus.2023-03-20.60q.tqb
Size 261 KB
Posted Mar 20, 2023
Download Huawei.H35-481.VCEplus.2023-03-20.60q.tqb

How to open VCEX & EXAM Files?

Files with VCEX & EXAM extensions can be opened by ProfExam Simulator.

Purchase

Coupon: MASTEREXAM
With discount: 20%






Demo Questions

Question 1

Which of the following statements about PDSCH DMR5 is incorrect?


  1. The start symbol of a front-loaded DMRS of a type B PDSCH is always the first symbol of PDSCH.
  2. The front-loaded DMRS is mandatory, and the additional DMRS is optional.
  3. The overhead of type 1 DMRS is less than that of type 2 DMRS.
  4. The start symbol of a front-loaded DMRS of a type A PDSCH can be symbol 2.
Correct answer: A
Explanation:
The statement "The start symbol of a front-loaded DMRS of a type B PDSCH is always the first symbol of PDSCH" is incorrect. In 5G NR, the start symbol of a front-loaded DMRS of a type B PDSCH can be configured as the first symbol of PDSCH or as the second symbol of PDSCH.You can refer to the Huawei official documentation for HCIP-5G-RAN V2.0 certification and the 3GPP 5G NR standard (38.211, 38.212, 38.213) for more information on PDSCH DMRS, including the configurations of the front-loaded DMRS, the DMRS symbols and the optional and mandatory nature of it.Here are some official references:Huawei HCIP-5G-RAN V2.0 certification page: https://e.huawei.com/en/certifications/hcip-5g-ranv2-03GPP5G NR standard: https://www.3gpp.org/specifications/5g-nr-specifications
The statement "The start symbol of a front-loaded DMRS of a type B PDSCH is always the first symbol of PDSCH" is incorrect. In 5G NR, the start symbol of a front-loaded DMRS of a type B PDSCH can be configured as the first symbol of PDSCH or as the second symbol of PDSCH.
You can refer to the Huawei official documentation for HCIP-5G-RAN V2.0 certification and the 3GPP 5G NR standard (38.211, 38.212, 38.213) for more information on PDSCH DMRS, including the configurations of the front-loaded DMRS, the DMRS symbols and the optional and mandatory nature of it.
Here are some official references:
Huawei HCIP-5G-RAN V2.0 certification page: https://e.huawei.com/en/certifications/hcip-5g-ranv2-03GPP5G NR standard: https://www.3gpp.org/specifications/5g-nr-specifications



Question 2

Which of the following statements about NR subcarriers are incorrect?


  1. The larger the subcarrier spacing, the larger the number of symbols.
  2. The smaller the subcarrier spacing, the larger the CP length and the more suitable it becomes for wide coverage.
  3. The smaller the subcarrier spacing, the lower the power spectral density.
  4. The larger the subcarrier spacing, the larger the slot length.
Correct answer: ABD
Explanation:
The statement A is incorrect. The larger the subcarrier spacing [1], the shorter the symbol duration on each subcarrier, not the larger number of symbols. Statement B is also incorrect. The larger the subcarrier spacing [1], the larger the CP length and the more suitable it becomes for wide coverage.Statement C is correct. The smaller the subcarrier spacing, the lower the power spectral density.Statement D is incorrect. The larger the subcarrier spacing [1], the shorter the slot length.https://asp-eurasipjournals.springeropen.com/articles/10.1186/s13634-020-00696-11. A novel timing and frequency offset estimation algorithm for filtered ...https://asp-eurasipjournals.springeropen.com/articles/10.1186/s13634-020-00696-1https://www.sciencedirect.com/topics/engineering/extended-cyclic-prefixExtended Cyclic Prefix - an overview | ScienceDirect Topicshttps://www.sciencedirect.com/topics/engineering/extended-cyclic-prefixhttp://www.techplayon.com/5g-nr-numerology-subcarrier-spcaing-scs/5G NR Numerology - Subcarrier Spcaing (SCS)  Techplayonhttp://www.techplayon.com/5g-nr-numerology-subcarrier-spcaing-scs/
The statement A is incorrect. The larger the subcarrier spacing [1], the shorter the symbol duration on each subcarrier, not the larger number of symbols. Statement B is also incorrect. The larger the subcarrier spacing [1], the larger the CP length and the more suitable it becomes for wide coverage.
Statement C is correct. The smaller the subcarrier spacing, the lower the power spectral density.
Statement D is incorrect. The larger the subcarrier spacing [1], the shorter the slot length.
https://asp-eurasipjournals.springeropen.com/articles/10.1186/s13634-020-00696-1
1. A novel timing and frequency offset estimation algorithm for filtered ...
https://asp-eurasipjournals.springeropen.com/articles/10.1186/s13634-020-00696-1
https://www.sciencedirect.com/topics/engineering/extended-cyclic-prefix
Extended Cyclic Prefix - an overview | ScienceDirect Topics
https://www.sciencedirect.com/topics/engineering/extended-cyclic-prefix
http://www.techplayon.com/5g-nr-numerology-subcarrier-spcaing-scs/
5G NR Numerology - Subcarrier Spcaing (SCS)  Techplayon
http://www.techplayon.com/5g-nr-numerology-subcarrier-spcaing-scs/



Question 3

Which of the following actions will trigger SgNB release by the MeNB?


  1. The UE inactivity timer on the NR side expires.
  2. An inter-SgNB cell change occurs.
  3. The MeNB detects that the X2 link is abnormal.
  4. The air interface link on the NR side is abnormal, and a UE reports SCG Failure Info to the eNodeB.
Correct answer: AD
Explanation:
The UE inactivity timer on the NR side expiring and the air interface link on the NR side being abnormal, and a UE reporting SCG Failure Info to the eNodeB, can both trigger the MeNB to release the SgNB. Other actions, such as an inter-SgNB cell change or the MeNB detecting an abnormal X2 link, may also lead to SgNB release, but are not the trigger for it.https://www.sciencedirect.com/topics/engineering/extended-cyclic-prefixExtended Cyclic Prefix - an overview | ScienceDirect Topicshttps://www.sciencedirect.com/topics/engineering/extended-cyclic-prefixhttp://www.techplayon.com/5g-nr-numerology-subcarrier-spcaing-scs/5G NR Numerology - Subcarrier Spcaing (SCS)  Techplayonhttp://www.techplayon.com/5g-nr-numerology-subcarrier-spcaing-scs/
The UE inactivity timer on the NR side expiring and the air interface link on the NR side being abnormal, and a UE reporting SCG Failure Info to the eNodeB, can both trigger the MeNB to release the SgNB. Other actions, such as an inter-SgNB cell change or the MeNB detecting an abnormal X2 link, may also lead to SgNB release, but are not the trigger for it.
https://www.sciencedirect.com/topics/engineering/extended-cyclic-prefix
Extended Cyclic Prefix - an overview | ScienceDirect Topics
https://www.sciencedirect.com/topics/engineering/extended-cyclic-prefix
http://www.techplayon.com/5g-nr-numerology-subcarrier-spcaing-scs/
5G NR Numerology - Subcarrier Spcaing (SCS)  Techplayon
http://www.techplayon.com/5g-nr-numerology-subcarrier-spcaing-scs/









CONNECT US

Facebook

Twitter

PROFEXAM WITH A 20% DISCOUNT

You can buy ProfExam with a 20% discount!



HOW TO OPEN VCEX FILES

Use ProfExam Simulator to open VCEX files