Download IBM.C1000-031.Pass4Sure.2020-01-21.61q.vcex

Download Exam

File Info

Exam Power Systems Scale-Up Technical Sales
Number C1000-031
File Name IBM.C1000-031.Pass4Sure.2020-01-21.61q.vcex
Size 35 KB
Posted Jan 21, 2020
Download IBM.C1000-031.Pass4Sure.2020-01-21.61q.vcex

How to open VCEX & EXAM Files?

Files with VCEX & EXAM extensions can be opened by ProfExam Simulator.

Purchase

Coupon: MASTEREXAM
With discount: 20%






Demo Questions

Question 1

A customer has a significant investment in open source software for performing in-memory analytics. This workload is currently deployed on Linux and recent x86 hardware. 
What advantage would a POWER9 processor-based server provide this customer?


  1. Faster ChipKill correction rate
  2. More cache per core
  3. More cores per socket
  4. Faster PCIe bandwidth
Correct answer: C



Question 2

Due to an emergency situation, a customer needs to activate all processor and memory resources in a Power System E980 for ten days. 
Which of the following could be used to achieve this need with the least possible cost?


  1. Elastic CoD
  2. Trial CoD
  3. Utility CoD
  4. Static Activation
Correct answer: A
Explanation:
Reference: https://www-01.ibm.com/common/ssi/ShowDoc.wss?docURL=/common/ssi/rep_ca/6/877/ENUSZG18-0086/index.html&request_locale=en
Reference: https://www-01.ibm.com/common/ssi/ShowDoc.wss?docURL=/common/ssi/rep_ca/6/877/ENUSZG18-0086/index.html&request_locale=en



Question 3

What is the advantage of NVMe U.2 flash drives on a Power System E980 SAP HANA BW implementation?


  1. They can provide internal boot capability for dual VIOS.
  2. They allow for Live Partition Mobility of HANA databases through CAPI 2.0.
  3. They can provide AIX Preferred Read storage to reduce SAN latency.
  4. They can act as an extension to memory for HANA databases.
Correct answer: C



Question 4

A customer with a Power System E880C is considering a model conversion to a Power System E980. They currently have Elastic CoD enabled. 
Which of the following steps will need to be completed to continue to use Elastic CoD on the Power System E980?


  1. Prepay for Elastic CoD usage when placing the upgrade MES order for the Power System E980.
  2. Reorder the Elastic CoD enablement features when placing the upgrade MES order for the Power System E980.
  3. Reorder the Utility CoD enablement features when placing the upgrade MES order for the Power System E980.
  4. Convert static activations to mobile activations when placing the upgrade MES order for the Power System E980.
Correct answer: A
Explanation:
Reference: https://www-01.ibm.com/common/ssi/cgi-bin/ssialias?htmlfid=899/ENUSLG18-0083&infotype=AN&subtype=CA
Reference: https://www-01.ibm.com/common/ssi/cgi-bin/ssialias?htmlfid=899/ENUSLG18-0083&infotype=AN&subtype=CA



Question 5

A customer has four AIX VMs, each running a different application that needs simultaneous read/write access to the same files. 
Which of the following products should be recommended?


  1. PowerHA Enterprise Edition
  2. Spectrum Scale
  3. Spectrum Protect
  4. PowerHA Standard Edition
Correct answer: A



Question 6

A customer with an AIX in-house SMT2 application on POWER6 would like to upgrade to POWER9. The customer would like to know the relative performance of the servers. 
Which resource provides the SMT2 performance of the two systems?


  1. IBM Performance Management for Power Systems
  2. IBM Power Systems Performance Report
  3. IBM Power Systems Facts and Features
  4. IBM Systems Workload Estimator
Correct answer: A



Question 7

Which of the following statements is true regarding Power Enterprise Pools?


  1. The XML configuration file can be downloaded from the ESS (My Entitled Systems Support) web site.
  2. One Enterprise pool can contain the following machine types: Power Systems E870, E870C, E880C, and E980.
  3. Mobile activations can be moved within a pool at any time, without contacting IBM.
  4. A minimum of 75% of a system’s memory activation can be mobile.
Correct answer: C
Explanation:
Reference: https://www-01.ibm.com/support/docview.wss?uid=nas8N1022430
Reference: https://www-01.ibm.com/support/docview.wss?uid=nas8N1022430



Question 8

While migrating from a Power System E880 to a Power System E980, which of the following is automatically provided on both systems?


  1. PowerVM Standard Edition
  2. IBM Cloud PowerVC Manager
  3. PowerVM Enterprise Edition
  4. IBM Cloud Private
Correct answer: B



Question 9

Which of the following is an advantage of Power System Servers over Oracle Exadata solutions?


  1. Support for Flash Drives
  2. Ability to add cores and memory
  3. Can run Oracle 12C natively
  4. Offers a greater quantity of cores for enhanced scaling
Correct answer: B
Explanation:
Reference: https://www.slideshare.net/miguelnoronha/why-oracle-on-ibm-power7-is-better-than-oracle-exadata-the-advantages-of-ibm-power7-systems (slide 10)
Reference: https://www.slideshare.net/miguelnoronha/why-oracle-on-ibm-power7-is-better-than-oracle-exadata-the-advantages-of-ibm-power7-systems (slide 10)



Question 10

A customer is considering a purchase of a Power System E950. One PCIe Gen3 I/O expansion drawer is required to meet the I/O adapter requirements. 
How many racks units (EIA) are required?


  1. 8
  2. 9
  3. 6
  4. 10
Correct answer: C
Explanation:
Reference: http://www.redbooks.ibm.com/redpapers/pdfs/redp5509.pdf
Reference: http://www.redbooks.ibm.com/redpapers/pdfs/redp5509.pdf









CONNECT US

Facebook

Twitter

PROFEXAM WITH A 20% DISCOUNT

You can buy ProfExam with a 20% discount!



HOW TO OPEN VCEX FILES

Use ProfExam Simulator to open VCEX files