Download IBM.C1000-038.Prep4Sure.2019-12-03.21q.vcex

Download Exam

File Info

Exam IBM z14 Technical Sales
Number C1000-038
File Name IBM.C1000-038.Prep4Sure.2019-12-03.21q.vcex
Size 18 KB
Posted Dec 03, 2019
Download IBM.C1000-038.Prep4Sure.2019-12-03.21q.vcex

How to open VCEX & EXAM Files?

Files with VCEX & EXAM extensions can be opened by ProfExam Simulator.

Purchase

Coupon: MASTEREXAM
With discount: 20%






Demo Questions

Question 1

A z14 ZR1 is configured for Capacity Marker W06 and 6 IFLs. At the time of purchase, the customer had not expected growth. Therefore, the CPC was configured as a Max12 (FC#0637). However, additional Java workload makes the deployment of a zIIP engine feasible. 
What are the considerations, if any, that the customer has to include into their plans for upgrading?


  1. Depending on the type of specially engine (IFL, ICF, zIIP, or SAP) the additional resource can be added concurrently to the existing CPC model.
  2. None. The upgrade is done by changing the microcode and can be activated concurrently.
  3. A change in the z14 ZR1 CPC drawer feature upgrade is disruptive. The additional engine will have an impact on the maintenance cost.
  4. All IBM software contracts have to be checked and amended to include the new zIIP engine.
Correct answer: B



Question 2

A client has a production data center and disaster recovery data center separated by more than 300 km. 
What level of recovery can they achieve by using GDPS/GM (Global Mirror)?


  1. RPO = 0, RTO = 0
  2. RPO = 0, RTO > 0
  3. RPO > 0, RTO = 0
  4. RPO > 0, RTO > 0
Correct answer: D
Explanation:
Reference: https://www.ibm.com/downloads/cas/RJNOXAGZ
Reference: https://www.ibm.com/downloads/cas/RJNOXAGZ



Question 3

A z/OS customer is concerned about complying with privacy rules. 
How is the concept of Pervasive Encryption a potential solution to address the concern?


  1. It is implemented without application or database changes.
  2. It is implemented by only requiring database changes.
  3. It is implemented by requiring application changes.
  4. It is implemented by encrypting only the data at rest.
Correct answer: A
Explanation:
Reference: https://www.ibm.com/downloads/cas/04WL0WAJ
Reference: https://www.ibm.com/downloads/cas/04WL0WAJ



Question 4

What customer records are required to quickly assess system performance in a z/OS environment?


  1. RMF report showing FICON channel statistics
  2. Network TCP records
  3. SCRT records
  4. SMF type 70 and 113 records
Correct answer: D



Question 5

When planning a new disk unit to populate the reserved 16U space on a z14 ZR1, what could prevent installation? 


  1. 8U minimum and two power cords
  2. Weight and power consumption
  3. Height and maximum capacity
  4. 6U minimum and Flash
Correct answer: C
Explanation:
Reference: https://www-01.ibm.com/common/ssi/ShowDoc.wss?docURL=/common/ssi/rep_ca/4/877/ENUSZG18-0024/index.html&lang=en&request_locale=en
Reference: https://www-01.ibm.com/common/ssi/ShowDoc.wss?docURL=/common/ssi/rep_ca/4/877/ENUSZG18-0024/index.html&lang=en&request_locale=en



Question 6

The IBM z14 has an Integrated Firmware Processor (IFP), which is used to manage native PCle features. 
Which groups of native features are managed by the IFP?


  1. zHyperlink Express, zEDC, FICON Express 16s
  2. Coupling Express LR, RoCE Express2, ICA SR
  3. Crypto Express, zEDC, Flash Express
  4. zEDC, RoCE Express2, Coupling Express LR
Correct answer: D
Explanation:
Reference: https://books.google.com.pk/books?id=xiZ0DwAAQBAJ&pg=PA470&lpg=PA470&dq=IBM+z14+has+an+Integrated+Firmware+Processor+(IFP),+which+is+used+to+manage+native+PCle+features.+Which+groups+of+native+features+are+managed+by+the+IFP&source=bl&ots=0R7ztx5SFg&sig=ACfU3U2zO7mmaivOizB93yxng6PJDvePDQ&hl=en&sa=X&ved=2ahUKEwiV4Zqeqo3mAhUDU1AKHSEYA-AQ6AEwAHoECAkQAQ#v=onepage&q=IBM%20z14%20has%20an%20Integrated%20Firmware%20Processor%20(IFP)%2C%20which%20is%20used%20to%20manage%20native%20PCle%20features.%20Which%20groups%20of%20native%20features%20are%20managed%20by%20the%20IFP&f=false
Reference: https://books.google.com.pk/books?id=xiZ0DwAAQBAJ&pg=PA470&lpg=PA470&dq=IBM+z14+has+an+Integrated+Firmware+Processor+(IFP),+which+is+used+to+manage+native+PCle+features.+Which+groups+of+native+features+are+managed+by+the+IFP&source=bl&ots=0R7ztx5SFg&sig=ACfU3U2zO7mmaivOizB93yxng6PJDvePDQ&hl=en&sa=X&ved=2ahUKEwiV4Zqeqo3mAhUDU1AKHSEYA-AQ6AEwAHoECAkQAQ#v=onepage&q=IBM%20z14%20has%20an%20Integrated%20Firmware%20Processor%20(IFP)%2C%20which%20is%20used%20to%20manage%20native%20PCle%20features.%20Which%20groups%20of%20native%20features%20are%20managed%20by%20the%20IFP&f=false



Question 7

A client from the banking industry operates its IBM Z environment in two data centers with a database of 10 kilometers (6.2 miles). Each data center has one IBM z14 and one DS8K storage system, which are PPRC enabled. 
Due to regulations, this client has the need to implement a near-continuous availability solution including long-distance disaster recovery for a new-to-build third site with a new third storage system. 
Which of the following solutions satisfies the requirements?


  1. GDPS Metro Global Mirror
  2. GDPS Metro HyperSwap Manager
  3. GDPS Metro Global – XRC
  4. GDPS Global – GM
Correct answer: B
Explanation:
Reference: https://www.ibm.com/developerworks/community/blogs/accelerate/resource/GDPS_Update_100317.pdf?lang=en (16)
Reference: https://www.ibm.com/developerworks/community/blogs/accelerate/resource/GDPS_Update_100317.pdf?lang=en (16)



Question 8

A potential client has never had any exposure to IBM Z architecture. You were told that the client is working on a project to deploy a non-structured type database into x86 servers as part of a cloud offering. 
Which components of the database as a service solution should be presented to this future client?


  1. LinuxONE, Linux, and MySQL DB
  2. LinuxONE, Linux, and Db2 DB
  3. LinuxONE, Linux, and Oracle DB
  4. LinuxONE, Linux, and Mongo DB
Correct answer: D
Explanation:
Reference: https://www.ibm.com/downloads/cas/EWLX8LGJ
Reference: https://www.ibm.com/downloads/cas/EWLX8LGJ



Question 9

A client with a fully depreciated production zBC12 would like to upgrade to a z14 ZR1 of equal capacity. At the same time, they would complete a data center move to a location across the country requiring minimal downtime. 
Which of the following would typically be the most economical way to migrate them from the zBC12 to the z14 ZR1, accommodating the data center move while providing the least amount of downtime? 


  1. Purchase a net new z14 ZR1 for installation in the new data center.
  2. MES the zBC12 to a z14 ZR1 located in the new data center.
  3. MES zBC12 to z14 ZR1 in the current location; then move the z14 ZR1 to the new location.
  4. Perform a Migration Offering from zBC12 to the z14 ZR1 in the new data center.
Correct answer: A



Question 10

What is needed to enable dataset encryption for z/OS?


  1. CPACF, Crypto coprocessor, and Secure Container levels
  2. Crypto coprocessor, HCD, and RACF levels
  3. Crypto coprocessor, CPACF, and RACF levels
  4. CPACF, Crypto coprocessor, and ICSF levels
Correct answer: C
Explanation:
Reference: https://www.ibm.com/support/knowledgecenter/en/SSLTBW_2.4.0/com.ibm.zos.v2r4.idak100/encryption23.htm
Reference: https://www.ibm.com/support/knowledgecenter/en/SSLTBW_2.4.0/com.ibm.zos.v2r4.idak100/encryption23.htm









CONNECT US

Facebook

Twitter

PROFEXAM WITH A 20% DISCOUNT

You can buy ProfExam with a 20% discount!



HOW TO OPEN VCEX FILES

Use ProfExam Simulator to open VCEX files