Download IBM.C2010-555.CertKiller.2018-12-27.46q.vcex

Download Exam

File Info

Exam IBM Maximo Asset Management v7.6 Functional Analyst
Number C2010-555
File Name IBM.C2010-555.CertKiller.2018-12-27.46q.vcex
Size 27 KB
Posted Dec 27, 2018
Download IBM.C2010-555.CertKiller.2018-12-27.46q.vcex


How to open VCEX & EXAM Files?

Files with VCEX & EXAM extensions can be opened by ProfExam Simulator.

Purchase

Coupon: MASTEREXAM
With discount: 20%






Demo Questions

Question 1

An administrator has a requirement to create 44 new assets that each share a common configuration. 
Which application can do this with a single action? 


  1. Assets
  2. Item Master
  3. Classifications
  4. Asset Templates
Correct answer: D
Explanation:
Reference: http://www.ibm.com/support/knowledgecenter/SSWK4A_7.5.0/com.ibm.mame.doc/c_essentials_oview.html
Reference: http://www.ibm.com/support/knowledgecenter/SSWK4A_7.5.0/com.ibm.mame.doc/c_essentials_oview.html



Question 2

A user belongs to two non-independent security groups, Group A and Group B. Group A has a purchasing limit of $7000 and Group B has a purchasing limit of $8000. 
What is the purchasing limit of a user who belongs to both security groups?


  1. $7000
  2. $8000
  3. $15000
  4. $56000
Correct answer: B



Question 3

What costing method should be used if the receipt cost of items that are the newest in stock is required?


  1. LIFO
  2. FIFO
  3. Average
  4. Standard
Correct answer: A
Explanation:
Reference: http://www.ibm.com/support/knowledgecenter/SSLKT6_7.5.0/com.ibm.mam.doc/glossary/glossary.html
Reference: http://www.ibm.com/support/knowledgecenter/SSLKT6_7.5.0/com.ibm.mam.doc/glossary/glossary.html



Question 4

Which report option provides multiple access points for an end user to run reports including the toolbar shortcuts of Browser View, Direct Print, Direct Print with 
Attachments and direct access from application dialogs including Work Order Status Change and Inventory Reorder?


  1. ERI
  2. BIRT
  3. Cognos
  4. SQL Server
Correct answer: B
Explanation:
Reference: https://www.ibm.com/developerworks/community/wikis/home?lang=en#!/wiki/IBM%20Maximo%20Asset%20Management/page/BIRT%20Reporting
Reference: https://www.ibm.com/developerworks/community/wikis/home?lang=en#!/wiki/IBM%20Maximo%20Asset%20Management/page/BIRT%20Reporting



Question 5

An approved work order has been assigned an incorrect job plan. 
How do you correct this? 


  1. Change the Job Plan Revision to the correct revision.
  2. Clear the Job Plan field and enter the correct job plan.
  3. Create a Follow-up work order with the correct job plan.
  4. Select Remove Work Plan from the More Actions menu and enter the correct job plan.
Correct answer: D



Question 6

The user wants to have a new job plan reference an existing job plan so that the data in the existing job plan will be available without re-entering it. 
What is the name of this feature?


  1. Nested job plans
  2. Job plan revisions
  3. Job plan sequences
  4. Attachment job plans
Correct answer: B



Question 7

A custom field has been added to the Work Order Tracking application to identify the inspector for environmental impacts of each work order. 
What type of role is used to assign the work order to the environmental inspector?


  1. Person
  2. Person Group
  3. A set of data related to the record
  4. A set of data related to the login user 
Correct answer: A



Question 8

A supervisor is required to report actual work hours by work order number. 
With which statuses can this be accomplished? (Choose two.) 


  1. INPRG
  2. WAPPR
  3. CANCEL
  4. PNDREV
  5. COMPLETE
Correct answer: AB



Question 9

A fixed-schedule PM needs to be set up. 
What other setting need to be selected in addition to the frequency value?


  1. Alert Lead (DAYS) must equal 0
  2. Alert Lead (DAYS) must be greater than 0 
  3. Use Last Work Order's Start Date to Calculate Next Due Date? checked
  4. Use Last Work Order's Start Date to Calculate Next Due Date? unchecked
Correct answer: C
Explanation:
Reference: http://www.ibm.com/support/knowledgecenter/SSLL8M_7.5.0/com.ibm.nuc.doc/pluspm/c_pm_frequency_schedules.html
Reference: http://www.ibm.com/support/knowledgecenter/SSLL8M_7.5.0/com.ibm.nuc.doc/pluspm/c_pm_frequency_schedules.html



Question 10

A company has a requirement to have items in the storerooms to be reordered automatically. 
How can this be achieved?


  1. Reorder Escalation
  2. Reorder Cron Task
  3. Reorder – Reorder Items
  4. Reorder Direct Issue Items/Services
Correct answer: C









PROFEXAM WITH A 20% DISCOUNT

You can buy ProfExam with a 20% discount!



HOW TO OPEN VCEX FILES

Use ProfExam Simulator to open VCEX files