Download IBM.C9010-262.TestKing.2019-02-22.114q.vcex

Download Exam

File Info

Exam IBM Power Systems with POWER8 Enterprise Technical Sales Skills V2
Number C9010-262
File Name IBM.C9010-262.TestKing.2019-02-22.114q.vcex
Size 609 KB
Posted Feb 22, 2019
Download IBM.C9010-262.TestKing.2019-02-22.114q.vcex

How to open VCEX & EXAM Files?

Files with VCEX & EXAM extensions can be opened by ProfExam Simulator.

Purchase

Coupon: MASTEREXAM
With discount: 20%






Demo Questions

Question 1

A customer recently purchased a Power E870 that includes redundant Service Processors, and would like to implement dual HMCs. 
What does IBM’s Best Practice documentation recommend?


  1. Each HMC should be connected to both Service Processors on a separate private network.
  2. The HMCs should share the same DHCP range.
  3. Each HMC should be managed by PowerVC.
  4. The HMCs should use the same subnet to connect to the service processors.
Correct answer: A
Explanation:
Using a redundant HMC configuration with your service processor setup requires a specific port configuration, as shown in the figure below.     The HMC’s first Ethernet port, eth0, should be configured to be a Dynamic Host Configuration Protocol (DHCP) server over a private network. References: IBM Power Systems HMC Implementation and Usage Guide (April 2013), page 43http://www.redbooks.ibm.com/redbooks/pdfs/sg247491.pdf
Using a redundant HMC configuration with your service processor setup requires a specific port configuration, as shown in the figure below. 
  
The HMC’s first Ethernet port, eth0, should be configured to be a Dynamic Host Configuration Protocol (DHCP) server over a private network. 
References: IBM Power Systems HMC Implementation and Usage Guide (April 2013), page 43
http://www.redbooks.ibm.com/redbooks/pdfs/sg247491.pdf



Question 2

A customer purchased a new E870. They would like to implement Linux-based infrastructure solutions such as:
  • email serving 
  • Web serving 
  • Network services 
  • email filtering 
Which of the following will help to establish a proof of concept implementation for these applications?


  1. PowerCare
  2. PowerVC Manager
  3. PowerVM
  4. Power POC Redbook
Correct answer: C
Explanation:
The PowerVM hypervisor supports multiple operating environments on a single system. Live AIX, Linux and IBM i VMs can be moved between servers, eliminating planned downtime. References: http://www-03.ibm.com/systems/power/software/virtualization/features.html
The PowerVM hypervisor supports multiple operating environments on a single system. Live AIX, Linux and IBM i VMs can be moved between servers, eliminating planned downtime. 
References: http://www-03.ibm.com/systems/power/software/virtualization/features.html



Question 3

Which of the following RAS features is always enabled and functional on an E870 / E880, regardless of configuration?


  1. System auto-restart
  2. Dynamic Processor Sparing
  3. Dynamic Memory Sparing
  4. Processor Instruction Retry
Correct answer: D
Explanation:
Processor Instruction Retry allows the system to recover from soft faults that otherwise result in outages of applications or the entire server. Note: Within the processor core, soft error events might occur that interfere with the various computation units. When such an event can be detected before a failing instruction is completed, the processor hardware might be able to try the operation again by using the advanced RAS feature that is known as Processor Instruction Retry.Reference: IBM Power Systems E870 and E880 Technical Overview and Introduction (October 2014), page 150https://mrt.presalesadvisor.com/PowerStoragePDF/687.pdf
Processor Instruction Retry allows the system to recover from soft faults that otherwise result in outages of applications or the entire server. 
Note: Within the processor core, soft error events might occur that interfere with the various computation units. When such an event can be detected before a failing instruction is completed, the processor hardware might be able to try the operation again by using the advanced RAS feature that is known as Processor Instruction Retry.
Reference: IBM Power Systems E870 and E880 Technical Overview and Introduction (October 2014), page 150
https://mrt.presalesadvisor.com/PowerStoragePDF/687.pdf



Question 4

Which of the following is a feature in PowerVM?


  1. Hard capping of virtual machines
  2. Processor Micro-Threading
  3. Active Memory Expansion
  4. SR-IOV adapter support
Correct answer: A
Explanation:
PowerVM supports Shared processor pools, which have the following benefit: Processor resources for a group of VMs can be capped, reducing software license costs Reference: http://www-03.ibm.com/systems/power/software/virtualization/features.html
PowerVM supports Shared processor pools, which have the following benefit: 
Processor resources for a group of VMs can be capped, reducing software license costs 
Reference: http://www-03.ibm.com/systems/power/software/virtualization/features.html



Question 5

Which IBM product is used to build, deploy, and manage infrastructure?


  1. PowerVM
  2. PowerVP
  3. PowerVC Manager
  4. PowerSC Manager
Correct answer: A
Explanation:
PowerVM provides a secure and scalable server virtualization environment for AIX, IBM i and Linux applications built upon the advanced RAS features and leading performance of the Power Systems platform. Incorrect Answers:B: PowerVP provides real time performance information which identifies performance bottlenecks using a graphical display showing the performance health of virtualized workloads mapping VMs to physical resources.C: PowerVC is designed to improve administrator productivity and simplify the cloud management of VMs on Power Systems servers.D: IBM PowerSC provides a security and compliance solution optimized for virtualized environments on Power Systems servers.References: http://www-03.ibm.com/systems/power/software/virtualization/
PowerVM provides a secure and scalable server virtualization environment for AIX, IBM i and Linux applications built upon the advanced RAS features and leading performance of the Power Systems platform. 
Incorrect Answers:
B: PowerVP provides real time performance information which identifies performance bottlenecks using a graphical display showing the performance health of virtualized workloads mapping VMs to physical resources.
C: PowerVC is designed to improve administrator productivity and simplify the cloud management of VMs on Power Systems servers.
D: IBM PowerSC provides a security and compliance solution optimized for virtualized environments on Power Systems servers.
References: http://www-03.ibm.com/systems/power/software/virtualization/



Question 6

Which feature of POWER8 processor-based systems is optimized for big data solutions?


  1. 40GbE FCoE adapter
  2. PCIe Gen3 I/O Expansion Drawer
  3. Memory bandwidth
  4. Internal Split Backplane
Correct answer: C
Explanation:
The Bandwidth of POWER8 is Critical for Big Data Workloads like Spark. References: https://www.ibm.com/developerworks/community/blogs/f0f3cd83-63c2-4744-9021-9ff31e7004a9/entry/The_Bandwidth_of_POWER8_is_Critical_for_Big_Data_Workloads_like_Spark?lang=en
The Bandwidth of POWER8 is Critical for Big Data Workloads like Spark. 
References: https://www.ibm.com/developerworks/community/blogs/f0f3cd83-63c2-4744-9021-9ff31e7004a9/entry/The_Bandwidth_of_POWER8_is_Critical_for_Big_Data_Workloads_like_Spark?lang=en



Question 7

A Power 770 MMD with two CEC enclosures 256GB of memory, and PCIe expansion drawers with SAS disk is being upgraded to a Power E870. 
Which of the following is a valid process to leverage the existing client investment and maintain the existing serial number?


  1. Remove expansion drawers. 
    Perform an MES upgrade of the memory and processor to POWER8. 
    Migrate disk to the E870 system nodes.
  2. Remove expansion drawers. 
    Add EXP24S. 
    Perform an MES upgrade of the memory and processor to POWER8.
  3. Migrate expansion drawers. 
    Perform an MES upgrade of the memory and processor to POWER8.
  4. Migrate expansion drawers. 
    Migrate disk. 
    Perform an MES upgrade of the memory and processor to POWER8.
Correct answer: D
Explanation:
The following features that are present on the current system can be moved to the new system if they are supported in the Power E870 and E880:Disks (within an EXP24S I/O drawer) SSDs (within an EXP24S I/O drawer) PCIe adapters with cables, line cords, keyboards, and displays Racks Doors EXP24S I/O drawers For POWER7+ processor-based systems that have the Elastic CoD function enabled, you must reorder the elastic CoD enablement features when placing the upgrade MES order for the new Power E870 or E880 system to keep the elastic CoD function active. To initiate the model upgrade, the on/off enablement features should be removed from the configuration file before the MES order is started. Any temporary use of processors or memory owed to IBM on the existing system must be paid before installing the Power E870 or E880.   References: IBM Power Systems E870 and E880 Technical Overview and Introduction, page 28http://www.redbooks.ibm.com/redpapers/pdfs/redp5137.pdf
The following features that are present on the current system can be moved to the new system if they are supported in the Power E870 and E880:
Disks (within an EXP24S I/O drawer) 
SSDs (within an EXP24S I/O drawer) 
PCIe adapters with cables, line cords, keyboards, and displays 
Racks 
Doors 
EXP24S I/O drawers 
For POWER7+ processor-based systems that have the Elastic CoD function enabled, you must reorder the elastic CoD enablement features when placing the upgrade MES order for the new Power E870 or E880 system to keep the elastic CoD function active. To initiate the model upgrade, the on/off enablement features should be removed from the configuration file before the MES order is started. Any temporary use of processors or memory owed to IBM on the existing system must be paid before installing the Power E870 or E880.   
References: IBM Power Systems E870 and E880 Technical Overview and Introduction, page 28
http://www.redbooks.ibm.com/redpapers/pdfs/redp5137.pdf



Question 8

A FlashSystem 840 attaches to a Power E870 via:


  1. 16Gb Fibre Channel adapter.
  2. 8Gb GX++ adapter.
  3. large write cache SAS adapter.
  4. Optical CXP converter adapter.
Correct answer: A
Explanation:
The IBM FlashSystem 840 supports three different protocol interface cards:Fibre Channel (16 Gbps, 8 Gbps, and 4 Gbps) Fibre Channel over Ethernet (FCoE) (10 Gbps) InfiniBand QDR (40 Gbps) iSCSI (10 Gbps) References: Implementing IBM FlashSystem 840 (July 2015), page 26http://www.redbooks.ibm.com/redbooks/pdfs/sg248189.pdf
The IBM FlashSystem 840 supports three different protocol interface cards:
  • Fibre Channel (16 Gbps, 8 Gbps, and 4 Gbps) 
  • Fibre Channel over Ethernet (FCoE) (10 Gbps) 
  • InfiniBand QDR (40 Gbps) 
  • iSCSI (10 Gbps) 
References: Implementing IBM FlashSystem 840 (July 2015), page 26
http://www.redbooks.ibm.com/redbooks/pdfs/sg248189.pdf



Question 9

Which of the following is a benefit of Power Enterprise Pools?


  1. Has no restrictions on where or how long cores and memory can be relocated.
  2. Provides automatic load balancing based on built in policies enabled in PowerVM.
  3. Provides greater flexibility to manage core and memory availability for workloads.
  4. Can use a Scale-out system temporarily in certain conditions.
Correct answer: C
Explanation:
Power Enterprise Pools (PEP) provides the ability to move processor and memory resources from one server to another any time, with no physical movement of hardware, using easy operator commands in HMC.  The PEP topology is a set of servers that is entitled to share a set of hardware processor and memory licenses between them.  This grouping and sharing allows for fast workload balancing and LPM (Logical Partition Mobility) activity while keeping overall server capital costs lower. One does not have to purchase licenses for all resources on all systems, but instead can purchase fewer licenses overall and move them when needed, to and from servers as their workload requirements rise and fall. References: https://www.ibm.com/developerworks/community/wikis/home?lang=en_us#!/wiki/Power%20Systems/page/Power%20Enterprise%20Pools
Power Enterprise Pools (PEP) provides the ability to move processor and memory resources from one server to another any time, with no physical movement of hardware, using easy operator commands in HMC.  The PEP topology is a set of servers that is entitled to share a set of hardware processor and memory licenses between them.  This grouping and sharing allows for fast workload balancing and LPM (Logical Partition Mobility) activity while keeping overall server capital costs lower. One does not have to purchase licenses for all resources on all systems, but instead can purchase fewer licenses overall and move them when needed, to and from servers as their workload requirements rise and fall. 
References: https://www.ibm.com/developerworks/community/wikis/home?lang=en_us#!/wiki/Power%20Systems/page/Power%20Enterprise%20Pools



Question 10

A customer would like to add a second HMC to an environment which consists of multiple POWER7 and POWER8 systems. 
Which of the following is a requirement for both HMCs to be able to manage all the systems?


  1. Both HMCs must be on the same HMC VLAN.
  2. Each HMC must be on a dedicated HMC VLAN.
  3. All the POWER7 systems must be at the same firmware level.
  4. Both HMCs must be at the same version of HMC Code.
Correct answer: D
Explanation:
HMC Version 8 can be used for POWER8, POWER7, and POWER6 based servers. HMC Version 7 can used for POWER7, POWER6 and POWER5 based servers. References: https://www-304.ibm.com/support/customercare/sas/f/hmcl/home.html
HMC Version 8 can be used for POWER8, POWER7, and POWER6 based servers. 
HMC Version 7 can used for POWER7, POWER6 and POWER5 based servers. 
References: https://www-304.ibm.com/support/customercare/sas/f/hmcl/home.html









CONNECT US

Facebook

Twitter

PROFEXAM WITH A 20% DISCOUNT

You can buy ProfExam with a 20% discount!



HOW TO OPEN VCEX FILES

Use ProfExam Simulator to open VCEX files