Download iSQI.CTAL-TM_Syll2012.TestKing.2018-06-01.37q.tqb

Download Exam

File Info

Exam ISTQB Certified Tester Advanced Level - Test Manager [Syllabus 2012]
Number CTAL-TM_Syll2012
File Name iSQI.CTAL-TM_Syll2012.TestKing.2018-06-01.37q.tqb
Size 1 MB
Posted Jun 01, 2018
Download iSQI.CTAL-TM_Syll2012.TestKing.2018-06-01.37q.tqb

How to open VCEX & EXAM Files?

Files with VCEX & EXAM extensions can be opened by ProfExam Simulator.

Purchase

Coupon: MASTEREXAM
With discount: 20%






Demo Questions

Question 1

You can count on well-written requirements, but you can’t count on an adequate contribution of the stakeholders to the quality risk analysis. You have to mitigate the insufficient contribution of the stakeholders because the risk-based testing approach shall minimize the product risks. Your test team has one expert tester in security testing. 
Which of the following test activities would you expect to be the less important in this context?


  1. Extract from the defect tracking system of the previous project all the security defects and failures, and classify them to support design and execution of  specific tests
  2. Automate all functional and non-functional system tests
  3. Apply systematic and exploratory testing for integration and system test
  4. Perform exploratory testing sessions with adequate charters covering security aspects
Correct answer: B



Question 2

Test Management 
You are the Test Manager on a project following an iterative life-cycle model. The project should consist of nine iterations of one month duration each. It is planned to develop the most important features to have a stable core of the application in the first three iterations and to add the additional features in the last six iterations. 
At the beginning of the first iteration, only a draft version of the requirements specification document for the core features is available. Assume that during each of the first three iterations, the chosen features are fully completed and unit tested. 
Which of the following statements is true in this context?


  1. The system test phase should start when all the requirements are frozen
  2. You should allocate a large effort for system testing during the first three iterations
  3. You should allocate all the effort for the system test phase only in the last iteration
  4. You should apply the same test strategy as used in a sequential life cycle model
Correct answer: B



Question 3

Test Management 
Which of the following statements, about the test reporting activities for a project adopting an iterative lifecycle model with very short iterations (e.g. two weeks iterations), is correct?


  1. Test reporting activities can’t be influenced by the use of an iterative lifecycle model with short iterations
  2. Test reporting activities are not important for projects adopting an iterative lifecycle model with short iterations
  3. Test reporting activities are less important for projects adopting an iterative life cycle model with short iterations. They should be performed at the end of the last iteration
  4. Test reporting activities are still important with an iterative lifecycle. The reports can be used to conduct post-iteration review sessions before starting with the next iteration
Correct answer: D



Question 4

Test Management 
Consider an agile team adopting Extreme Programming (XP) with five developers and one tester without any coding experience. 
To which of the following activities would you expect the tester will contribute most?


  1. Developing unit tests
  2. Executing unit tests
  3. Planning and executing tests during the integration test phase to detect interface defects
  4. Supporting the customer in the execution of acceptance testing
Correct answer: D



Question 5

Test Management 
Which of the following statements best describes an appropriate approach for managing exploratory testing?


  1. Define very detailed mission statements, which allow testing work to be broken into sessions of up to 10 minutes duration in which testing is guided by these mission statements
  2. Break the testing work in 30 to 120 minutes sessions and use properly defined mission statements consisting of two or three sentences to guide testing during these sessions
  3. Define very generic charters to drive exploratory testing sessions of 2 days where testers are completely free to decide what to test
  4. Exploratory testing should not be managed because such testing is inherently unmanageable and not measurable
Correct answer: B