Download iSQI.CTFL-Foundation.Pass4Sure.2018-10-15.35q.tqb

Download Exam

File Info

Exam Certified Tester - Foundation Level (Syllabus 2011)
Number CTFL-Foundation
File Name iSQI.CTFL-Foundation.Pass4Sure.2018-10-15.35q.tqb
Size 499 KB
Posted Oct 15, 2018
Download iSQI.CTFL-Foundation.Pass4Sure.2018-10-15.35q.tqb

How to open VCEX & EXAM Files?

Files with VCEX & EXAM extensions can be opened by ProfExam Simulator.

Purchase

Coupon: MASTEREXAM
With discount: 20%






Demo Questions

Question 1

Which of the following would NOT be a common metric used for monitoring test preparation and execution? 


  1. Number of Test cases passed and failed
  2. Percentage of planned test cases designed
  3. Number of test plan review comments
  4. Percentage of tasks complete in test environment preparation
Correct answer: B



Question 2

Which of the following would you NOT expect to see on an incident report from test execution?


  1. The version(s) of the software under test
  2. The test execution schedule
  3. Expected results and actual results
  4. Precise steps to reproduce the problem
Correct answer: B



Question 3

Which of the following would be a good test technique to use when under severe time pressure?


  1. Exploratory testing
  2. Structure based testing
  3. Specification based testing
  4. Use Case testing
Correct answer: B



Question 4

Which of the following options BEST explain the pesticide paradox principle of testing?


  1. If we do not regularly review and revise our tests, we'll stop finding defects.
  2. Repeatedly running a set of tests will ensure that a system is defect free.
  3. Defects are, paradoxically, often contained in a small number of modules.
  4. Testing, like spraying pesticide, is an effective bug / defect removal activity.
Correct answer: C



Question 5

During the development of a software change for a system, the developer makes a mistake in his work, which leads to a fault in the code. Unfortunately the fault is not found by software testing and is released into live. 
What is the definite consequence of this mistake?


  1. The system will fail, causing a defect.
  2. If the defect is executed, the system may fail.
  3. Loss of money, time, or business reputation.
  4. Contractual requirements have not been met by testing. 
Correct answer: B









CONNECT US

Facebook

Twitter

PROFEXAM WITH A 20% DISCOUNT

You can buy ProfExam with a 20% discount!



HOW TO OPEN VCEX FILES

Use ProfExam Simulator to open VCEX files