Download iSQI.CTFL-Foundation.Pass4Sure.2019-06-14.129q.vcex

Download Exam

File Info

Exam Certified Tester - Foundation Level (Syllabus 2011)
Number CTFL-Foundation
File Name iSQI.CTFL-Foundation.Pass4Sure.2019-06-14.129q.vcex
Size 636 KB
Posted Jun 14, 2019
Download iSQI.CTFL-Foundation.Pass4Sure.2019-06-14.129q.vcex

How to open VCEX & EXAM Files?

Files with VCEX & EXAM extensions can be opened by ProfExam Simulator.

Purchase

Coupon: MASTEREXAM
With discount: 20%






Demo Questions

Question 1

During which stage of the fundamental test process is the testability of requirements evaluated?


  1. Test Implementation and Execution
  2. Test Planning and Control
  3. Evaluating Exit Criteria and Reporting
  4. Test Analysis and Design
Correct answer: D



Question 2

A new testing tool has been selected for an organization and a pilot project has successfully completed. The next step is to deploy the tool within the organization. 
What is a key success factor in tool deployment?


  1. Estimate a cost-benefit ratio based on a firm business case.
  2. Determine whether benefits will be achieved at reasonable cost.
  3. Provide support for the test team using the tool.
  4. Assessment of organizational maturity, strengths and weaknesses.
Correct answer: A



Question 3

Which of the following represents good testing practice for testers, irrespective of the software lifecycle model used?


  1. They should start test analysis when the corresponding development level is complete.
  2. They should be involved in reviewing requirements or user stories as soon as drafts are available.
  3. They should ensure that the same test objectives apply to each test level.
  4. They should minimize the ratio of development levels to test levels to reduce project costs.
Correct answer: D



Question 4

You are examining a document which gives the precise steps needed in order to execute a test. 
What is the correct definition of this document?


  1. Test design specification
  2. Test condition
  3. Test procedure specification
  4. Test case specification
Correct answer: C



Question 5

Which of the following would you NOT expect to see on an incident report from test execution?


  1. The version(s) of the software under test
  2. The test execution schedule
  3. Expected results and actual results
  4. Precise steps to reproduce the problem
Correct answer: B



Question 6

Which of the following options BEST explain the pesticide paradox principle of testing?


  1. If we do not regularly review and revise our tests, we'll stop finding defects.
  2. Repeatedly running a set of tests will ensure that a system is defect free.
  3. Defects are, paradoxically, often contained in a small number of modules.
  4. Testing, like spraying pesticide, is an effective bug / defect removal activity.
Correct answer: C



Question 7

During the development of a software change for a system, the developer makes a mistake in his work, which leads to a fault in the code. Unfortunately the fault is not found by software testing and is released into live. 
What is the definite consequence of this mistake?


  1. The system will fail, causing a defect.
  2. If the defect is executed, the system may fail.
  3. Loss of money, time, or business reputation.
  4. Contractual requirements have not been met by testing.
Correct answer: B



Question 8

You have been asked to improve the way test automation tools are being used in your company. Which one of the following is the BEST approach?


  1. Selecting and automating scripts that test new functionality to find the most defects
  2. Using a keyword-driven testing approach to separate the actions and data from the tool’s script
  3. Ensuring that all data, inputs and actions are stored in the tool’s script for ease of maintenance
  4. Keeping expected results separate from the automation tool to allow the testers to check the results
Correct answer: A



Question 9

Your task is to compile a test execution schedule for the current release of software. 
The system specification states the following logical dependencies:
  • An admin user must create/amend/delete a standard user. 
  • A standard user is necessary to perform all other actions. 
The test plan requires that re-tests must be performed first, followed by the highest priority tests. To save time, the test plan states that tests should be scheduled to create test data for the subsequent tests in the schedule. 
The following test cases have been designed, with an indication of priority (1 being the highest priority) and whether the test has previously failed. 
  
Which test execution schedule meets the test plan requirements and logical dependencies?


  1. a, d, c, b, e
  2. a, c, b, d, e
  3. e, a, b, c, d
  4. e, a, d, c, b
Correct answer: C



Question 10

Your company is developing a system with complex business rules and many branches in the structure of its code components. You need to choose one black box technique and one white box technique for test case design. 
Which one of the following offers the BEST choice?


  1. Statement testing and exploratory testing
  2. Decision testing and equivalence partitioning
  3. Decision testing and decision table testing
  4. Boundary value analysis and decision table testing
Correct answer: D









CONNECT US

Facebook

Twitter

PROFEXAM WITH A 20% DISCOUNT

You can buy ProfExam with a 20% discount!



HOW TO OPEN VCEX FILES

Use ProfExam Simulator to open VCEX files