Download iSQI.CTFL-Foundation.Train4Sure.2018-12-22.86q.tqb

Download Exam

File Info

Exam Certified Tester - Foundation Level (Syllabus 2011)
Number CTFL-Foundation
File Name iSQI.CTFL-Foundation.Train4Sure.2018-12-22.86q.tqb
Size 743 KB
Posted Dec 22, 2018
Download iSQI.CTFL-Foundation.Train4Sure.2018-12-22.86q.tqb

How to open VCEX & EXAM Files?

Files with VCEX & EXAM extensions can be opened by ProfExam Simulator.

Purchase

Coupon: MASTEREXAM
With discount: 20%






Demo Questions

Question 1

А garden irrigation system allows the user to specify 2 inputs. 
  1. Frequency - The number of times the system should be automatically switched on per day; minimum once per day, maximum 5 times 
  2. Duration - The duration of operation, in whole minutes, each time it is switched on, ranging from 1 to 60 
Applying 2-value boundary value analysis which of the following options has the correct test set of valid and invalid boundary values?


  1. Frequency 1, 5; Duration 1, 60
  2. Frequency 0, 1, 5, 6; Duration 59 seconds, 1 minute, 60 minutes, 60 minutes 1 second
  3. Frequency 0, 1, 5, 6; Duration 0, 1, 60, 61
  4. Frequency 0, 1, 2, 5, 6; Duration 0, 1, 30, 60, 61
Correct answer: B



Question 2

  
The decision table above reflects a golf club’s pricing structure for green fees and buggy/cart hire. 
What is the expected result (actions) for each of the following two test cases (TC1 and TC2)? 
  • TC1 - Paul is not a full member, is a Loyalty Card holder and requests to play 18 holes with a buggy/cart 
  • TС2 - Cheryl is not a full member, doesn’t have a Loyalty Card and requests to play 9 holes with a buggy/cart


  1. TC1 - £23 total charge including buggy hire; TC2 - £21 total charge including buggy hire
  2. TC1 - £18 total charge including buggy hire; TC2 - £16 total charge but no buggy allowed
  3. TC1 - £23 total charge including buggy hire; TC2 - £16 total charge but no buggy allowed
  4. TC1 - £17 total charge but no buggy allowed; TC2 - £21 total charge including buggy hire
Correct answer: C



Question 3

Which of the following activities is appropriate to the test planning stage?


  1. Analyzing the test basis
  2. Assigning resources for the planned activities
  3. Designing the test environments
  4. Writing a test execution schedule
Correct answer: B









CONNECT US

Facebook

Twitter

PROFEXAM WITH A 20% DISCOUNT

You can buy ProfExam with a 20% discount!



HOW TO OPEN VCEX FILES

Use ProfExam Simulator to open VCEX files