Question 1

Which list of levels of tester independence is in the correct order, starting with the most independent first?


  1. Tests designed by the author; tests designed by another member of the development team; tests designed by someone from a different company.
  2. Tests designed by someone from a different department within the company; tests designed by the author; tests designed by someone from a different company.
  3. Tests designed by someone from a different company; tests designed by someone from a different department within the company; tests designed by another member of the development team.
  4. Tests designed by someone from a different department within the company; tests designed by someone from a different company; tests designed by the author.
Correct answer: C
Explanation:
This option has someone nearer to the written code in each statement. All other options are not in this order.
This option has someone nearer to the written code in each statement. All other options are not in this order.



Question 2

Which of the following is in the correct order (typically)?


  1. Unit testing, system testing, acceptance testing, maintenance testing.
  2. System testing, unit testing, acceptance testing, maintenance testing.
  3. Acceptance testing, system testing, maintenance testing, unit testing.
  4. Unit testing, maintenance testing, system testing, acceptance testing.
Correct answer: A



Question 3

Which TWO of the review types below are the BEST fitted (most adequate) options to choose for reviewing safety critical components in a software project? Select 2 options.


  1. Informal review.
  2. Management review.
  3. Inspection.
  4. Walkthrough
  5. Technical Review
Correct answer: CE



Question 4

Incidents would not be raised against


  1. Requirements
  2. Documentation
  3. Test cases
  4. Improvements suggested by users
Correct answer: D



Question 5

The cost of fixing a fault:


  1. Is not important
  2. Increases as we move the product towards live use
  3. Decreases as we move the product towards live use
  4. Is more expensive if found in requirements than functional design
  5. Can never be determined
Correct answer: B



Question 6

Which of the following statements are TRUE?  
    A) Regression testing and acceptance testing are the same. 
    B) Regression tests show if all defects have been resolved. 
    C) Regression tests are typically well-suited for test automation. 
    D) Regression tests are performed to find out if code changes have introduced or uncovered defects. 
    E) Regression tests should be performed in integration testing.


  1. A, C and D and E are true; B is false.
  2. A, C and E are true; B and D are false.
  3. C and D are true; A, B and E are false.
  4. B and E are true; A, C and D are false.
Correct answer: C



Question 7

Which is not the fundamental test process?


  1. Planning and control
  2. Test closure activities
  3. Analysis and design
  4. None
Correct answer: D



Question 8

What is the purpose of test completion criteria in a test plan:


  1. To know when a specific test has finished its execution
  2. To ensure that the test case specification is complete
  3. To set the criteria used in generating test inputs
  4. To know when test planning is complete
  5. To plan when to stop testing
Correct answer: E



Question 9

Which of the following statements describes a key principle of software testing?


  1. Automated tests allow better statements of confidence about the quality of software products.
  2. For a software system, it is normally impossible to test all the input and output combinations.
  3. Exhaustive software testing is, with enough effort and tool support, feasible for all software.
  4. The purpose of software testing is demonstrating the absence of defects in software products.
Correct answer: B



Question 10

Reviewing the test Basis is a part of which phase


  1. Test Analysis and Design
  2. Test Implementation and execution
  3. Test Closure Activities
  4. Evaluating exit criteria and reporting
Correct answer: A