Demo Questions

Question 1

Scenario 1 "Medical Domain" 
You are working as a test manager in the medical domain leading a team of system testers. You are currently working on a major release of the product which gives customers many new features and resolves a number of problem reports from previous releases. 
Since the system is in the medical domain and therefore in the safety critical area, testing needs to be rigorous and evidence is required that the system has been adequately tested. Identify THREE measures that would typically be part of the test approach in this domain and which are not always applicable in other domains!  


  1. High level of documentation
  2. Failure Mode and Effect Analysis (FMEA) sessions
  3. Traceability to requirements
  4. Non-functional testing
  5. Master test planning
  6. Test design techniques
  7. Reviews
Correct answer: ABC



Question 2

Scenario 1 "Medical Domain" 
You are working as a test manager in the medical domain leading a team of system testers. You are currently working on a major release of the product which gives customers many new features and resolves a number of problem reports from previous releases. 
A test log is one of the documents that need to be produced in this domain in order to provide evidence of testing. However, the level of detail of test logs can vary. 
Which of the following is NOT an influencing factor for the level of detail of the test logs being produced?


  1. Level of test execution automation
  2. Test level
  3. Regulatory requirements
  4. Experience level of testers
Correct answer: D



Question 3

Topic 2, Scenario 2 "Reviews"
A software development organization wants to introduce some specific improvements to its test process. Currently, most of their testing resources are focussedon system testing. They are developing embedded software, and do not have a simulation environment to enable them to execute software modules on the development host. They have been advised that introducing inspections and reviews could be the most appropriate step forward.
Identify the THREE types of formal peer reviews that can be recognized.


  1. Inspection
  2. Management review
  3. Walkthrough
  4. Audit
  5. Technical review
  6. Informal review
  7. Assessment
Correct answer: ACE



Question 4

Topic 2, Scenario 2 "Reviews"
A software development organization wants to introduce some specific improvements to its test process. Currently, most of their testing resources are focussedon system testing. They are developing embedded software, and do not have a simulation environment to enable them to execute software modules on the development host. They have been advised that introducing inspections and reviews could be the most appropriate step forward.
As part of the improvement program, the organization is also looking at tool support. Which type of tool could be used to ensure higher quality of the code to be reviewed?


  1. Review tool
  2. Test execution tool
  3. Static analysis tool
  4. Test design tool
Correct answer: C



Question 5

Topic 2, Scenario 2 "Reviews"
A software development organization wants to introduce some specific improvements to its test process. Currently, most of their testing resources are focussedon system testing. They are developing embedded software, and do not have a simulation environment to enable them to execute software modules on the development host. They have been advised that introducing inspections and reviews could be the most appropriate step forward.
IEEE 1028 also defines “management review” as a type of review. What is the main purpose of a management review?


  1. Align technical concepts during the design phase
  2. Establish a common understanding of requirements
  3. Provide independent evaluation of compliance to processes, regulations, standards etc.
  4. To monitor progress, assess the status of a project, and make decisions about future actions
Correct answer: D