Download Microsoft.MB-320.SelfTestEngine.2020-03-17.55q.tqb

Download Exam

File Info

Exam Microsoft Dynamics 365 for Finance and Operations, Manufacturing
Number MB-320
File Name Microsoft.MB-320.SelfTestEngine.2020-03-17.55q.tqb
Size 449 KB
Posted Mar 17, 2020
Download Microsoft.MB-320.SelfTestEngine.2020-03-17.55q.tqb

How to open VCEX & EXAM Files?

Files with VCEX & EXAM extensions can be opened by ProfExam Simulator.

Purchase

Coupon: MASTEREXAM
With discount: 20%






Demo Questions

Question 1

You are the production supervisor at a chemical processing plant. You must track attributes for each batch of chemicals. Automated quality orders must be generated when a batch order for these chemicals is reported as finished.  
You need to ensure that the values of attributes are updated and tracked.  
What three actions should you perform? Each correct answer presents part of the solution.  
NOTE: Each correct selection is worth one point.


  1. Assign the attributes to the chemicals
  2. Assign the attributes to the appropriate test on the test group
  3. Create attribute types
  4. Set up batch attributes
  5. Create a test instrument for each attribute
Correct answer: ADE



Question 2

A manufacturer produces HDMI cables. Typically, the item is manufactured.  
The manufacturer will occasionally buy unbranded HDMI cables from a vendor in order to keep up with demand. The company must use the same item number whether they make or buy the item.  
What should you do?


  1. Select route type as vendor on the route operation when the item is to be purchased.
  2. In default order settings, select Production for the default order type
  3. Create a new vendor resource when the item is to be purchased
  4. In default order settings, select Purchase for the default order type
Correct answer: A



Question 3

A company produces paints and assembles bicycle frames.  
You must account for paint drying time before assembly operations can begin. You need to set up the operation to encompass queue times.  
Which two options can you use? Each correct answer presents part of solution.  
NOTE: Each correct selection is worth one point.


  1. Enter a value in the queue time after field for the painting operation
  2. Make a resource group for each size and color and assign that group to the operation
  3. Enter a value in the transit time on the painting operation
  4. Enter a value in the queue time before field for the assembly operation
  5. Build capabilities for each resource related to color
Correct answer: AD









CONNECT US

Facebook

Twitter

PROFEXAM WITH A 20% DISCOUNT

You can buy ProfExam with a 20% discount!



HOW TO OPEN VCEX FILES

Use ProfExam Simulator to open VCEX files