Download SAP.C_TPLM30_67.VCEplus.2019-10-09.60q.vcex

Download Exam

File Info

Exam SAP Certified Application Associate - SAP Maintenance & Repair with ERP 6.0 EHP7
Number C_TPLM30_67
File Name SAP.C_TPLM30_67.VCEplus.2019-10-09.60q.vcex
Size 30 KB
Posted Oct 09, 2019
Download SAP.C_TPLM30_67.VCEplus.2019-10-09.60q.vcex


How to open VCEX & EXAM Files?

Files with VCEX & EXAM extensions can be opened by ProfExam Simulator.

Purchase

Coupon: MASTEREXAM
With discount: 20%






Demo Questions

Question 1

Your customer executes deadline monitoring (transaction IP30).
What happens after you insert additional call dates using the manual call function?


  1. The system restarts the maintenance plan.
  2. The system retains the normal scheduled call dates.
  3. The system fixes the next scheduled call date.
  4. The system reschedules all previous scheduled call dates.
Correct answer: B



Question 2

Your customer wants to settle costs of the refurbishment process to an inventory account.
What Customizing does the process require? (Choose two.)


  1. Special control keys for use in refurbishment operations.
  2. A specific order type for refurbishment processing.
  3. A specific settlement profile for the purpose of refurbishment.
  4. A specific notification type for refurbishment processing.
Correct answer: BC



Question 3

You have selected Confirmation Required in the control key for operations in a maintenance order. One of the operations is already partially confirmed.
Which system statuses can the order header display before all operations are finally confirmed? (Choose three.)


  1. TECO
  2. PCNF
  3. CRTD
  4. CNF
  5. CLSD
Correct answer: ABE



Question 4

Your customer wants to utilize estimated costs in Plant Maintenance orders.
Which condition does the customer need to be aware of? 


  1. Planned costs overwrite estimated costs after release of the order.
  2. A specific order type in which cost estimates are activated must be used.
  3. Planned costs must not exceed the estimated costs.
  4. Upon release of the order, estimated costs cannot be revised.
Correct answer: D



Question 5

What are the two options available for archiving order? (Choose two.)


  1. Manually enter historical orders
  2. Recognize orders
  3. Order settlement
  4. Refurbishment
  5. Copy orders
Correct answer: AB



Question 6

In order costing, what is the allocation structure used for?


  1. To provide a hierarchy structure for posting costs to the general ledger.
  2. To provide a structure to summarize postings across cost elements.
  3. To determine the cost element for debit to the order and credit from the order.
  4. To determine the overhead costs that need to be applied to each cost element.
Correct answer: C



Question 7

Find out the elements responsible for performance management. (Choose three.)


  1. Investment planning
  2. Project definition
  3. Execution
  4. DispatchE. Ordering
Correct answer: ABC



Question 8

What do you need to select when you create a maintenance plan that only generates notification(s)?


  1. A maintenance plan category for notifications.
  2. A specific notification type for maintenance plans.
  3. A specific notification type that includes a task list.
  4. A specific maintenance strategy for notifications.
Correct answer: A



Question 9

You customize an order type to release orders immediately upon creation, and you assign the order type to a maintenance item.
How can a user override the automatic release of the order without creating a new order type?


  1. Select a maintenance planner group and set the Do Not Release Immediately indicator.
  2. Set the Do Not Release Immediately indicator in the task list header.
  3. Set the Do Not Release Immediately indicator in planning data for the maintenance item.
  4. Select a maintenance activity type and set the Do Not Release Immediately indicator.
Correct answer: C



Question 10

For which business requirements must you use serial numbers? (Choose two.)


  1. To uniquely identify inventory material items.
  2. To have a future option to track material items as pieces of functional locations.
  3. To have a future option to track material items as pieces of equipment.
  4. To have the option to track batches.
Correct answer: AC









PROFEXAM WITH A 20% DISCOUNT

You can buy ProfExam with a 20% discount!



HOW TO OPEN VCEX FILES

Use ProfExam Simulator to open VCEX files