Download SAP.C_TPLM40_65.ExamCollection.2019-10-14.145q.vcex

Download Exam

File Info

Exam SAP Certified Application Associate - Quality Management with SAP ERP 6.0 EHP5
Number C_TPLM40_65
File Name SAP.C_TPLM40_65.ExamCollection.2019-10-14.145q.vcex
Size 74 KB
Posted Oct 14, 2019
Download SAP.C_TPLM40_65.ExamCollection.2019-10-14.145q.vcex

How to open VCEX & EXAM Files?

Files with VCEX & EXAM extensions can be opened by ProfExam Simulator.

Purchase

Coupon: MASTEREXAM
With discount: 20%






Demo Questions

Question 1

In the quality management view in the material master you can maintain the specifications for procurement for the following using the QM control key:


  1. Release required
  2. Block inactive
  3. Technical Delivery Terms
  4. Quality Assurance Agreement
  5. Certificate Requirement
Correct answer: C



Question 2

Which of the following statements accurately describe a client in an SAP system? (More than one answer is true.)


  1. A client has its own database.
  2. A client may represent an entire company.
  3. A client represents a completely independent business entity.
  4. A client corresponds to a customer.
Correct answer: BCD



Question 3

The “Post to Inspection Stock” indicator triggers automatic posting in the inspection stock.


  1. Correct
  2. Incorrect
Correct answer: A



Question 4

An inspection characteristic describes the inspection criteria.


  1. Incorrect
  2. Correct
Correct answer: B



Question 5

You can access the usage decision __________. (More than one answer is true.)


  1. Automatically
  2. From results recording
  3. Manual
  4. Using the worklist
Correct answer: ACD



Question 6

Which statements are correct? (More than one answer is true.)


  1. A work center can’t be assigned to the operation in the task list.
  2. Materials, vendors, and customers can be assigned using the inspection plan header.
  3. The plan usage is stored in the inspection plan header.
  4. Test equipment can be assigned directly to an inspection characteristic in an inspection plan.
Correct answer: BD



Question 7

An inspection is completed when the usage decision is made.


  1. Correct
  2. Incorrect
Correct answer: A



Question 8

Which statements are correct? (More than one answer is true.)


  1. Single authorization is required for the inspection lot, if the task list requires approval but has not yet been approved.
  2. The use of the material specification is dependent in the inspection setup in the Quality Management view of the material master.
  3. If additional material-dependent inspection specifications have to be stored for a particular material, a material specification can’t be used.
  4. Object management records disable changes to a certain object to be documented.
Correct answer: BD



Question 9

A master inspection characteristic is an inspection characteristic that has been defined for frequent use in task lists or should be evaluated for all inspection plans.


  1. Correct
  2. Incorrect
Correct answer: A



Question 10

If you work without a change number, the old values in the task list are overwritten by new values.


  1. Correct
  2. Incorrect
Correct answer: A









CONNECT US

Facebook

Twitter

PROFEXAM WITH A 20% DISCOUNT

You can buy ProfExam with a 20% discount!



HOW TO OPEN VCEX FILES

Use ProfExam Simulator to open VCEX files