Download Six Sigma.LSSMBB.CertDumps.2018-02-22.400q.vcex

Download Exam

File Info

Exam Lean Six Sigma Master Black Belt
Number LSSMBB
File Name Six Sigma.LSSMBB.CertDumps.2018-02-22.400q.vcex
Size 3 MB
Posted Feb 22, 2018
Download Six Sigma.LSSMBB.CertDumps.2018-02-22.400q.vcex


How to open VCEX & EXAM Files?

Files with VCEX & EXAM extensions can be opened by ProfExam Simulator.

Purchase

Coupon: MASTEREXAM
With discount: 20%






Demo Questions

Question 1

You are about to run a t-test on shield thickness from 2 suppliers when you determine the data from one group is not normally distributed and cannot be transformed.  
Your next step would be to?


  1. Use the Shapiro-Wilk test
  2. Proceed with the t-test
  3. Use a non - parametric test
  4. Discontinue the analysis
Correct answer: C



Question 2

A manufacturing test process has 3 parallel machines performing exactly the same test. The data from this test process can be assumed to be normally distributed and the variances within each machine are the same. To understand if there is a significant statistical difference in the average test value between machines, what test should be used?


  1. Kruskal - Wallis
  2. Chi-Square
  3. ANOVA
  4. Bartlett or Levene
Correct answer: C



Question 3

Which of the following is a commonly used test that examines the association between multiple discrete variables?


  1. Kruskal-Wallace Test
  2. Shapiro-Wilkes Test
  3. Student’s t-Test
  4. Chi-Square Test
Correct answer: D



Question 4

An engineer is trying to increase a product characteristic mean from the current production 850Å to above 855Å. The standard deviation of the current process and the proposed process are assumed to be the same, σCurrent = 7.7. The engineer wants to verify that the average difference of his new process as compared to the old process is statistically significant and is greater than 5Å. What are the correct statistical hypotheses for this engineering problem?


  1. Ho: µ New - µ Old ≤ 5, Ha: µ New - µ Old > 5
  2. Ho: µ New - µ Old=5, Ha: µ New - µ Old ≠ 5
  3. Ho: µ New = 850, Ha: µ New > 850
  4. Ho: σ New ≤ 7.7, Ha: σ New > 7.7
Correct answer: A



Question 5

Which of the following statistical procedures is appropriate when there is one continuous input variable variable (X) and one continuous output variable (Y)?


  1. T-test
  2. Chi-Square test
  3. One-Way ANOVA
  4. Correlation
Correct answer: D



Question 6

In a statistical analysis, the beta risk (β) is:


  1. The probability of rejecting the null hypothesis when it is true
  2. Always equal to 0.10
  3. Driven by the cost of sampling
  4. The probability of failing to reject the null hypothesis when it is false
Correct answer: D



Question 7

Sigma Saving and Loans processes loans and leases from around the world. The CEO wants to know if the current cycle time for processing is less than 9.5 days on average. To test the claim that the average cycle time is less than 9.5 days, use:


  1. A 1-sample T-test
  2. A 2 sample T-test
  3. A One-way ANOVA
  4. A Chi-square test of means
Correct answer: A



Question 8

Two different samples were pulled randomly from the same population. One sample is size n=10 and the other is size n=100. A two-sided confidence interval for the mean was calculated separately for each.  
How will the intervals compare?


  1. The confidence interval for size n=10 will be smaller.
  2. The confidence interval for size n=10 will be larger.
  3. The confidence intervals will be the same for both n=10 and n=100.
  4. There is not enough information given.
Correct answer: B



Question 9

The purpose of a screening experiment using DOE is to?


  1. Optimize the response by determining the best levels for the input factors
  2. Separating the “vital few from the trivial many”
  3. Comparing various levels for one factor
  4. Finding a set of levels for the inputs that produce a robust product
Correct answer: B



Question 10

Based on the DOE results illustrated in the image below, and considering the Hierarchy of Effects, what terms should be left in the model? Use an alpha of 0.10.
 


  1. Temp, Time, Temp*Pressure
  2. Temp, Time, Pressure, Temp*Pressure
  3. Time, Temp + Pressure
  4. Temp, Time
Correct answer: B









PROFEXAM WITH A 20% DISCOUNT

You can buy ProfExam with a 20% discount!



HOW TO OPEN VCEX FILES

Use ProfExam Simulator to open VCEX files